installed green capacity de-risked by first-loss co-financing.
tonnes of greenhouse gas emissions offset annually by the project.
sustainable direct and indirect jobs facilitated in local communities.
projected household and SME connections powered across Nigeria.
mobilized from institutional investors and pension funds into the real economy.
First Electric is deploying mesh-grid electricity networks with a total capacity of 724.8 kWp. This project aims to provide reliable power to off-grid households and small businesses across 20 communities in Gombe, Nasarawa, and Ondo States. The systems utilize solar PV technology supported by battery storage and inverters to ensure consistent power supply.
Remote community households and local agricultural mills across Gombe, Nasarawa, and Ondo states lacked access to clean energy grid systems. Relying on kerosene lamps and polluting petroleum engines caused high fuel expenses, carbon emissions, and stagnant community business growth.
CFBF co-financed and de-risked First Electric’s NGN debt financing to construct a 725kWp decentralized mesh grid electricity network. Utilizing intelligent metering and decentralized solar clusters, the project connects 5,156 households and SMEs directly.
Replaces traditional carbon-heavy lighting sources, saves over 762 tonnes of greenhouse gas emissions annually, and stimulates local agro-rural businesses with a stable and affordable power supply.
The project is financed through a blended, co-financing arrangement facilitated by InfraCredit. The UK-funded Climate Finance Blending Facility (CFBF) invested in the subordinated debt tranche, providing a 7-year fixed-rate local currency debt. The transaction was further supported by InfraCredit’s Construction Finance Warehouse Facility (CFWF), funded by the Nigeria Sovereign Investment Authority (NSIA), to provide short-term liquidity during the construction phase. InfraCredit provided its 'AAA'-rated credit guarantee to enhance the local currency debt issuance, de-risking it for domestic institutional investors. FSD Africa also supported upfront due diligence costs under a technical assistance agreement.
The project on completion is expected to electrify approximately 5,156 households and small businesses, create up to 616 temporary and permanent jobs, and avoid approximately 762 tonnes of greenhouse gas (GHG) emissions annually, contributing directly to Nigeria’s universal electrification goals and UN Sustainable Development Goal 7 (Affordable and Clean Energy).
Financing clean energy generation to power communities, foster innovation, and drive global climate action.
Optimizing energy consumption in sustainable cities and industrial infrastructure to reduce carbon footprints.
Empowering women in leadership and creating decent work opportunities across the clean energy value chain.
Collaborating with global and local institutions to mobilize capital for sustainable, inclusive development.
Funded the upfront due diligence costs for the Project through its technical assistance facility for climate aligned infrastructure bonds established with InfraCredit.
Rural retail shops powered for the first time by local clean energy grids.
CFBF provides subordinated debt and credit wraps to de-risk local currency financing. Check if your project meets our qualification standards or connect directly with our intake team.